Turtle Lake WW

Turtle Lake Wastewater Treatment NUMBER OF PANELS 45 SQUARE FOOTAGE 12,600 This project consisted of 3 different buildings utilizing a 12’’ insulated wall panel.  All together 45 walls to make up the over 12,600SF with a medium sandblast finish.  Also installed were...

Pilgrims Pride

Pilgrims Pride NUMBER OF PANELS 13 SQUARE FOOTAGE 2,500 Approximately 2,500SF of walls for an addition.  It was produced gray with a smooth form finish to be painted after erection. Back to Wall...

Thorp Wastewater Treatment

Thorp Wastewater Treatment NUMBER OF PANELS 13 SQUARE FOOTAGE 2,830 + 4 Roof Slabs DAYS ON SITE 1   This project consisted of 13 wall panels and 4 roof slabs totaling 2830 SF.  Walls utilized a smooth and water washed finish. Back to Wall...

Barron County Highway Department

Barron County Maintenance Facility NUMBER OF PANELS 285 SQUARE FOOTAGE 75,000 Walls consisted of a Light sandblast with an accent band that was heavy sandblast It also had 87,300 sqft of hollow core plank It is the largest project that we have done to date Back to...

Chippewa History Museum

Chippewa History Museum NUMBER OF PANELS 57 SQUARE FOOTAGE 16,750 LEVELS 3   The Chippewa Area History Center is a 3 level building featuring 57 wall panels produced in our plant. We also supplied 16,800 sq ft of hollowcore. This building is a great addition to...